
Infinity Park Derby
November 24, 2025
Catalyst Industrial Park
November 25, 2025Mulberry Logistics Development
37,500m² External Concrete Flooring Package
![]()
Project Overview
GOLDBED delivered 37,500m² of high-quality external concrete flooring for the new Mulberry Logistics development at Rockingham Gateway, Corby.
Mulberry has received detailed planning consent for a 500,000 sq ft logistics unit, pre-sold to a global third-party logistics provider. Our works formed a key part of the early delivery phase, ensuring a durable, high-performance external slab suitable for heavy logistics operations. The site team commended our workmanship, efficiency, and attention to detail throughout.
Our Role
-
37,500m² of external concrete flooring
-
Full site preparation and coordination
-
Concrete placement, finishing & curing
-
Durable industrial-grade surface finish
-
Full compliance with logistics sector loading requirements
-
Efficient delivery with minimal disruption to ongoing site works
-
Close collaboration with Mulberry and the main contractor
Project Highlights
-
37,500m² of external slab delivered
-
Supports a new 500,000 sq ft logistics facility
-
Pre-sold to a global logistics provider
-
High-tolerance, durable surface
-
Completed on schedule and to a very high standard
-
Praised by site management for quality and professionalism
Client Feedback
"The team GOLDBED delivered exceptional results on the Rockingham Gateway project. Their work on the 37,500 m² of external flooring was completed to a very high standard, on schedule, and with minimal disruption to site operations. The team demonstrated excellent technical expertise, attention to detail, and professionalism throughout the project. I would have no hesitation in recommending Goldbed Construction for future large-scale commercial projects."
— Project Manager, Rockingham Gateway Development



